A remodel is a
process, not a service

We run homes the way job sites are run: a schedule in working days, a signed report after every stage and a set of documentation you keep at the end.

FOUNDED 2013 TEAM 18 people SITES AT ONCE max. 4

Why we work
this way

We started in 2013 with single bathrooms. In the first years we made every mistake this trade is known for: we promised dates with no buffer, priced by eye and settled up at the end. The result was predictable — arguments and rework.

In 2019 we rewrote how we work. We moved to line-by-line estimates, partial sign-offs and a schedule counted in working days with a buffer for deliveries. Since then we have not changed the price mid-job on a single site.

We also capped the number of jobs running at once at four. It is less money over a year, but it means the crew is not driving between sites and the lead genuinely knows what is happening in your home.

03 / TEAM

Who runs
the work

Finished apartment — AustinPHOTO
MichaelPROJECT LEAD

Estimates, schedules, sign-offs. One point of contact for the whole remodel.

Finish work in progress — AustinPHOTO
MarkFOREMAN

Finishing: drywall, paint, ceilings. Twelve years on job sites.

Bathroom remodel — AustinPHOTO
AndrewTILE AND FLOORING

48×110 format, epoxy grout, waterproofing to code.

Finish work in progress — AustinPHOTO
PeterLICENSED ELECTRICIAN

Panels, wiring, testing and the paperwork the inspector signs.

04 / LOG

Timeline

  1. 2013.03

    First job — a 55 sq ft bathroom in Hyde Park. Two people, one set of tools.

  2. 2016.09

    First permanent finish crew. We move to whole homes.

  3. 2019.01

    Process rebuilt: line-by-line estimates, partial sign-offs, schedules in working days.

  4. 2022.06

    Job number one hundred. We open our own material store — no more waiting on suppliers.

  5. 2025.12

    310 jobs, 18 people, 96.4% on time and ± 3% estimate accuracy.

05 / QUESTIONS

You often
ask

Why only four job sites at a time?

Because at the fifth the lead stops being a lead and becomes a dispatcher. We would rather keep a waiting list and hit our dates than take everything and apologize.

What exactly do I get at the end?

A signed handover report, electrical and plumbing diagrams, test reports, material sheets, photos of the walls before they were closed and a 24-month warranty card.

Will you work from an interior designer's drawings?

Yes. We take the design, check it technically and price it line by line. If something cannot be built or is not worth the money, you hear it before the contract is signed.

See how we price it

The calculator on the home page estimates from 310 closed jobs.